The County NN/US 12 construction project is beginning this Saturday, 2/6/16. Crews will be on site to begin traffic pattern changes on the following roadways and highway ramps:
- County NN – Within the project limits, traffic currently travels on two lanes in each direction on County NN. After the traffic shift is executed on 2/6/16, traffic will be reduced to one lane in each direction. All traffic will then be travelling on what-is-now the westbound traffic side (north side) of the roadway.
- County H – The intersection with County NN will be closed as of 2/6/16.
- Ramp B (County NN onramp to westbound US 12) – Will be closed as of 2/6/16.
- Ramp D (eastbound US 12 offramp to County NN) – Will be closed as of 2/6/16.
- US 12 and Collector-Distributer Roads – There will be night time full closures from 9pm – 6am on these dates: 2/9/16, 2/10/16, 2/11/16 and 2/15/16. US 12 and the Collector-Distributer roadways will be open during the day time.
- Ramp A (westbound US 12 offramp to County NN) – Will remain open until further notice
- Ramp C (County NN onramp to eastbound US 12) – Will remain open until further notice
Regarding the overnight US12 full closures scheduled for February 9-11 and 15 from 9pm-6am, Ramp A (westbound 12 off ramp to County NN) will be closed as well during the same time period. The westbound US12 detour route will be as follows:
All westbound US12 traffic will be redirected to exit US12 at the WIS 120/US12 interchange. Traffic will be directed northbound on WIS 120 until the WIS 11 intersection. Traffic will be directed west on WIS 11 until the I-43/WIS 11 interchange. Traffic will have a choice to head north or south on I-43. For westbound US12 access, traffic will head southbound on I-43 and take the exit ramp to westbound US12 at the US12/I-43 interchange. The attached map shows all detour routes to bypass the portion of US12 that will be closed to traffic overnight.
.